6 sectors, 10 projects. Orientations, FLHAs, site escorts, and PPE before we can even open camera and drone cases.
Commissioning documented at Canada's largest lithium brine resource, 1.29 million tonnes LHM in the ground.
A company overview film for a Scottish veterinary diagnostics company, shot across a working farm and a working laboratory in a single day.
2 days of multi-agency rail HazMat training documented at CPKC's Ogden Campus. Responders working TRANSCAER's CCPX 911 training tank car, cut to a 2:00 film.
4 stages of demolition documented across the summer, from the building intact to a graded pad. Cut to a 1:45 film.
Aerial and ground documentation of Elan Construction's 4-day slab-on-grade pour at Starfield 4/5, a 193,621 sq ft industrial building in southeast Calgary. With Dynamic Concrete and BURNCO.
An association networking night in a vertical wind tunnel. 4 crew across the air, the floor and the glass, cut to a 1:46 recap and published 4 days later.
Documentary interview and B-roll capture for CPKC's 2024 Remembrance Day veteran profile. Brad Greene, Mechanical Heritage Team Lead, US Army veteran, third-generation railroader. 2:39 cinematic cut delivered in 7 days.
A brand and website for a construction progress portal: a stepped-bar P, a greyscale system with 1 hi-vis accent, and a site that explains the product in 4 steps.
9 pages rebuilt natively in Webflow, with 6 CMS collections so the crew publishes without a developer. The site you are reading is the deliverable.
7 client projects written up as case studies, each with its film, the numbers from the job and a field note from the crew who were on site. The Work page is the deliverable.