A CAT 336F excavator opening up the front of the East Village Experience Centre in Calgary
← All industries
Demolition & Site Clearing

Demolition documented stage by stage, intact to graded pad

We document demolition and site clearing for demolition contractors and the general contractors who hire them, in Calgary and across western Canada. Drone and ground coverage timed to each stage records the takedown and what left the site sorted.

WCB clearance available
$5M commercial liability
TC Advanced Operations
4
Stages of the Oakridge Co-op demolition captured, early takedown to final grade
1:45
Film for Elan Construction, cut from 4 site visits
53,427
Sq ft Co-op food store kept trading beside the takedown
— Selected clients

Project managers and business development leads at demolition contractors and general contractors, and owners who need the takedown on record.

Stage by stage documentation of demolition and site clearing, for the demolition contractors doing the work and the general contractors who hire them.

— Process

How a job runs

  1. Site and stages Visits set to the sequence: takedown, structure, below grade, final grade.
  2. Orientation Your orientation and FLHA first, then PPE on and clear of the working face.
  3. Capture Drone passes from the same positions each visit, plus machines and sorting.
  4. Deliver Stills from every stage and a short film for your website and LinkedIn.
— On site
Transport Canada Advanced Operations pilot certificates · CSTS, WHMIS, and First Aid · CCA member · ACSA member · SECOR in progress · $5M commercial liability coverage
— FAQ

Questions buyers ask

Can you film next to a business that stays open?

Yes. At Oakridge, Priestly Demolition took down the old Co-op store while the new one traded next door. We worked around the fencing that kept the live parking lot clear.

Can you show material recovery, not just the takedown?

Yes. At Oakridge, steel and metals were sorted on site into Calgary Metal bins. We filmed the shear, the grapple sorting rubble, and the loads leaving, so the record shows what was recovered.

How many visits does a demolition need?

Visits follow the stages, not a shoot week. Oakridge took 4 across the summer of 2025: early demolition, above-grade structure, below grade, and final grading.

What does demolition coverage cost?

Every quote is built from site days, crew, and deliverables. Tell us the site, the dates, and what the footage is for, and we reply within 1 business day.

— Tell us about your project

Tell us about your project.

Open the conversationWe reply within 1 business day
Direct line
+1 403 671 0007
Studio
Calgary, AB · Canada